Every field has its own vocabulary. Software has an unusually large one, because the field changes quickly and often names things badly.

If you have joined a software team, you may know the result. You spend your first year nodding along in meetings, while keeping a private list of words to look up later. I did exactly that.

This post is that list, already made. These aren't dictionary definitions, which you can find anywhere. For each term, I explain what it means in practice, why it exists, and the mistake that often comes with it. The words are grouped by the kind of conversation you will hear them in. Skim it now, and come back to it later when a word comes up.

Code and design words

Abstraction. Hiding how something works behind a simpler description of what it does. A sendEmail() function is an abstraction: you call it without knowing the details of SMTP (Simple Mail Transfer Protocol), the that actually sends email. Most of software engineering is building abstractions on top of other abstractions, and the usual argument is whether a given one hides the right things.

Leaky abstraction. An abstraction that doesn't hide everything, so you still end up needing to understand what it was supposed to hide. For example, an ORM, a library that lets you use a without writing SQL, hides the SQL until a query is slow. Then you are reading the SQL it generated anyway. Joel Spolsky's "law of leaky abstractions" says that every abstraction that does real work leaks a little.

A round portrait of Joel Spolsky, with his name below.
Joel Spolsky in 2005. He wrote about leaky abstractions in 2002 on his blog, Joel on Software, and later co-founded Stack Overflow.Photo: Flickr user sigurd, CC BY 2.0, via Wikimedia Commons (original). Changes: cropped to a circle and placed on a card with the name.

API. Short for Application Programming Interface. It's the part of a system that other code is allowed to use: its functions, its web addresses, and the shape of its data. When someone says "the ", they usually mean a web service's (Hypertext Transfer Protocol) addresses. When they say "a nice API", they mean a library that's pleasant to use.

Interface, or contract. A promise about what something offers and how it behaves, without saying how it works inside. For example: anything that has read() and close() counts as a file. Code written against an interface can switch to a different implementation without changing.

Coupling and cohesion. These two words come up in every design review. Coupling is how much separate parts of a program depend on each other's details, and you want little of it. Cohesion is how well the things inside one part belong together, and you want a lot of it. "Loosely coupled and highly cohesive" is the whole rule.

TIGHTLY COUPLEDMODULE AMODULE BA reaches into B in many placesLOOSELY COUPLEDMODULE AMODULE Bone narrow interface, so B can change inside
Coupling is how much one module depends on the inside of another.

Separation of concerns. Each part of a system has one kind of job. The database code doesn't build web pages, and the user interface doesn't calculate taxes. Ignoring this is how you end up with a file of 4,000 lines.

DRY. Short for Don't Repeat Yourself. The same piece of knowledge shouldn't live in two places, because the two copies will slowly become different. People sometimes apply it to code that only looks similar today, which led to the opposite slogan, WET, "write everything twice". Today most people agree that some repetition is cheaper than the wrong abstraction.

YAGNI. Short for You Aren't Gonna Need It. Don't build for future needs you are only imagining. A general, configurable version of a feature you might need next year costs you effort every day, and you may never need it.

KISS. Short for Keep It Simple, Stupid. It's the general rule against clever code. Clever code has a cost, because it's written for the writer's enjoyment rather than the reader's understanding, and code is read much more often than it's written.

Idempotent. Safe to run more than once. An idempotent operation leaves things in the same final state whether it runs once or five times. Setting a balance to 100 is idempotent. Adding 10 to a balance isn't.

This word matters a lot when systems talk over a network, because requests are often sent again after a timeout. If a payment request isn't idempotent, a timeout followed by a retry will charge someone twice.

beforerun oncerun twicerun 3 timesbalance = 10040100100100the same result however many times it runsbalance += 1040506070every retry changes it again
The two operations from the definition, run again and again. The highlighted cell is the retry that charges twice.

Deterministic. The same input always gives the same output. Randomness, timing and hidden shared state make code nondeterministic, which makes both testing and debugging harder.

Side effect. Anything a function does besides returning a value, such as writing a file, changing a global variable or sending an email. Side effects aren't bad, because programs exist to have them. But code is easier to understand when the side effects are kept in a few places at the edges, instead of spread everywhere.

Boilerplate. Repetitive setup code that a language or framework makes you write before anything interesting can happen. For example, fifty lines of imports and settings to show "hello world".

Magic. Behaviour that happens without any visible code causing it, usually because of a framework's rules. "It finds your routes automatically." That's convenient until it breaks. Then there is no code to read and nothing to step through in a debugger.

Code smell. A pattern that isn't a bug, but often means a bug is close by. A function with twelve arguments, a class called Manager, or if statements nested many levels deep. A smell is a reason to look more closely, not a reason to rewrite automatically.

Anti-pattern. A common solution that reliably makes things worse. A God Object is one class that does everything. A Big Ball of Mud is a system that grew piece by piece with no plan. These patterns have names so that a team can reject a design with one word instead of a whole meeting.

Spaghetti code. Code whose order of execution is so tangled that you can't follow it. A related term is lasagna code: so many neat layers that a one-line change touches nine files.

Working with code words

Refactoring. Changing the structure of code without changing what it does, to make it easier to work with. "Without changing what it does" is the definition. If you also fix bugs or add features, you aren't refactoring, you are just editing, and your reviewer can't tell which changes were supposed to make no difference.

Technical debt. Shortcuts taken now that make later changes slower, like a loan that collects interest. The comparison is useful because debt can be sensible: shipping quickly with a known shortcut is sometimes the right call. The problem is debt nobody writes down. It grows without anyone noticing, until ordinary changes take weeks. When someone says the team is "paying down tech debt", they mean a period of cleaning up code, with no new features to show at the end.

Legacy code. Code you are afraid to change, usually because nobody remembers how it works and no test would catch a mistake. Its age doesn't matter. Untested code from last year is already legacy code. Michael Feathers put it best: legacy code is code without tests.

Bikeshedding. Spending a meeting on the small thing everyone understands, such as a button's colour or a variable's name, while the hard thing nobody understands gets no discussion. It comes from a story about a committee that approved a nuclear power plant in minutes, then argued for hours about the staff bicycle shed.

Yak shaving. A chain of side jobs, where each one has to be finished before the one before it can continue. You wanted to fix a bug, which needed a library upgrade, which broke the build, which needed a new image. Now it's four in the afternoon, you are configuring , and you are nowhere near the bug.

Rubber duck debugging. Explaining your problem out loud to an object, such as a rubber duck, and spotting the mistake yourself while you explain. Putting your assumptions into words is what finds the bug.

Cargo culting. Copying the visible form of something successful without understanding why it works. Examples are pasting settings nobody on the team can explain, or splitting an app into many small services because Google does it. The name comes from the cargo cults of some Pacific islands after the Second World War, where people built copies of airstrips and control towers, hoping the supply planes would come back.

Bus factor. How many people would have to be hit by a bus before nobody understands the system. A bus factor of one is an emergency, even if nobody treats it as one yet.

Golden path, or happy path. The case where every input is valid and every service is working. Demos follow this path. Real use often doesn't, and most engineering work is handling the other paths.

Edge case, or corner case. An input at the limit of what the code expects: an empty list, 29 February, a name with an apostrophe, or a file that's exactly the size of the buffer. When someone says "it works", they usually mean the happy path works, and most bugs are in the edge cases.

a list of three itemsYOUR CODEhappy pathWORKSthe demoEDGE CASESan empty list29 Februarya name like O'Briena file exactly buffer-sized?most bugs are here
The happy path is one input. The edge cases are all the others.

Foot gun. A feature or API that makes it easy to "shoot yourself in the foot", meaning to hurt yourself by accident. C's strcpy, JavaScript's ==, or a delete command that accepts a wildcard.

Version control and collaboration words

Repo, commit, branch, merge. The basic words of . A repo () is the project's history. A commit is one saved set of changes. A branch is a separate line of work. A merge joins two lines of work back together.

PR or MR. Short for Pull Request or Merge Request. It's a set of changes packaged for review before it joins the main branch, and it's how almost every team works together. The two names mean the same thing: GitHub says PR, and GitLab says MR.

Code review. Another person reading your changes before they are merged. It's half a quality check and half a way of sharing knowledge. Review comments have their own words. Nit means a small point, take it or leave it. Blocking means fix this before merging. LGTM means "looks good to me", and it's an approval.

Merge conflict. Two branches changed the same lines, and Git won't guess which change to keep, so a person has to choose. It's usually routine work, and sometimes you have to read the history to understand both changes.

Rebase. Moving your branch's commits so they start from the latest version of the main branch. It gives a cleaner history than a merge. People have argued about this for years: rebasing is tidy but rewrites history, and merging keeps the real history but makes it messy.

BEFOREmain and a branchABCXYMERGEkeeps the forkABCXYMM joins the twolines of historyREBASEreplays on topABCXYX'Y'one straightline
The same branch brought into main both ways.

Trunk-based development. Everyone merges small changes into the main branch often, usually every day, instead of keeping long-lived branches. It's usually used with feature flags, and it has mostly replaced heavier ways of using branches.

Monorepo and polyrepo. One huge repository for all of a company's code, or one repository for each project. A monorepo lets you change many projects in one commit, and shows how they depend on each other. The cost is tooling that has to cope with the size of everything.

Upstream and downstream. Words for direction. Upstream is the source you depend on, such as the original project your copy came from. Downstream is whoever depends on you. "Fix it upstream" means fix it at the source, rather than changing your own copy.

Process words

Agile. Originally a 2001 statement of values that put working software and responding to change ahead of documents and fixed plans. In daily use, it has become a set of regular meetings. When someone says their team is "agile", they usually mean it has standups and sprints.

Scrum, sprint, standup, retro. The regular meetings and work cycles. Scrum is one particular agile method. A sprint is its fixed work cycle, usually two weeks. A standup is a short daily meeting where each person says what they are working on and what is holding them up. A retro, short for retrospective, is the meeting at the end of a sprint about what to improve.

BACKLOGSTORYBUGSTORYand many morepicked12345678910a standup every working dayone sprint, usually two weeksRETRO
One sprint, from the backlog to the retro.

Backlog. The ordered list of everything the team might do, from urgent to "maybe one day". Feature requests wait here, and many are never done.

Story, epic, ticket. Units of planned work, from small to large. A story is a small piece users can see, such as "a user can reset their password". An epic is a group of related stories. Ticket is the general word in an issue tracker for any of these, and for bugs.

Story points and velocity. Story points estimate how much effort a task takes compared with other tasks, on purpose not in hours. Velocity is how many points a team usually finishes per sprint. It's useful for planning, and it stops being accurate as soon as managers treat it as a productivity score. That's Goodhart's law: when a measure becomes a target, it stops being a good measure.

A round portrait of Charles Goodhart, with his name below.
Charles Goodhart, the British economist the law is named after, in 2015. He described the idea in 1975, about how governments measured the amount of money in the economy.Photo: Financial Times, CC BY 2.0, via Wikimedia Commons (original). Changes: cropped to a circle and placed on a card with the name.

MVP. Short for Minimum Viable Product. It's the smallest version that tests whether anyone wants the product at all. The argument is always about the word "viable". It has to really work, or you have only learned that people don't like broken software.

Scope creep. A feature planned for one sprint growing to four, one small addition at a time, where each addition seemed reasonable. It can sink a project without anyone noticing.

Blocked, or blocker. You can't continue until something outside your control is sorted out: a missing API, a decision nobody has made, or another team's review. Saying it at the standup lets others know they can help, which is the reason to say it.

Bandwidth. Free time to take on more work. "I don't have bandwidth" is a polite way to say no at work.

Deprecated. Officially discouraged, and planned to be removed, but still working for now. Code that uses deprecated features will break on a date someone else chooses.

Testing and quality words

Unit, integration, and end to end tests. The testing pyramid, sorted by how much each test covers. A unit test checks one function on its own. It's fast, so you have thousands. An integration test checks several parts working together. It's slower, so you have fewer. An end-to-end test uses the whole system the way a real user would. It's the slowest and the least reliable, so you have the fewest.

END TO ENDthe whole system, like a real user:the slowest, and the fewestINTEGRATIONseveral components together:slower, so fewerUNITone function alone:fast, so thousands
The width of each layer is how many of those tests you have.

TDD. Short for Test-Driven Development. Write a failing test first, then the code that makes it pass, then tidy up. This is called "red, green, ". Some people always work this way, and most do it only sometimes.

Mock, stub, fixture. Fake stand-ins used in tests. A mock records how it was called, so the test can check that. A stub only returns prepared answers. A fixture is prepared test data. Too many mocks is a smell of its own, because then the tests check the mocks rather than the software.

Flaky test. A test that passes, then fails, then passes again, with no code changed. Usually a hidden timing problem is underneath. A few flaky tests do a lot of damage, because once a team gets used to re-running failed tests, a failure stops meaning anything.

Regression. Something that used to work and now doesn't, broken by a change that seemed unrelated. Regression tests exist so that old bugs can't quietly come back.

Smoke test. The quickest possible check that the system works at all after a . Does the home page load? Does login work? The name comes from hardware: plug it in and see whether smoke comes out.

Code coverage. The percentage of lines of code that your tests run. It's useful for finding untested code. It's dangerous as a goal, because you can reach 100% with tests that check nothing.

Shift left. Finding problems earlier in the process: style checks in the editor instead of in review comments, and security scans in CI instead of an audit after launch. "Left" means earlier on a timeline drawn from left to right.

Shipping and operations words

CI and CD. Short for Continuous Integration and Continuous Delivery. With CI, every push is built and tested automatically. With CD, builds that pass are then deployed automatically, or can be deployed with one click. The change in culture underneath is that releasing should be routine and frequent, not a big event every few months.

Dev, staging, prod. The places code lives as it matures: your own computer, a copy of the real system for final checks, and the real system with real users. "It works in staging" is the modern version of "it works on my machine".

PUSHyour machineBUILDautomaticTESTautomaticSTAGINGprod look-alikePRODreal usersCI: every push isbuilt and testedCD: a build that passesis deployed
CI covers the build and the tests. CD covers what happens to a build that passes.

Deploy, release, rollback. To deploy is to put new code on the . To release is to make it visible to users, which is more and more often a separate step. To roll back is to undo it quickly when things look bad.

Feature flag. An if statement that turns a feature on or off while the program runs, without deploying again. It lets you deploy code with the feature hidden, try it on 1% of users, or switch off a bad feature instantly. The cost is that old flags pile up, and the number of possible on-and-off combinations becomes hard to think about.

Canary deployment and blue green. Two ways to release with less risk. A canary sends a small share of traffic to the new version, so you can watch for problems. The name comes from canaries that miners once carried to warn them of dangerous gas. Blue-green runs the old and new versions side by side and switches all traffic from one to the other, which makes undoing it instant.

CANARYUSERSv1oldv2newmost of thetraffica trickle,watched for troubleBLUE GREENUSERSv1oldv2newstill running,to flip back toall the traffic,after the flip
Both keep the old version running while the new one takes traffic.

Incident, postmortem, on call. An incident is the live system being broken. A postmortem is the meeting afterwards about why it happened. On call is the rota for who gets woken up at three in the morning. A postmortem should be blameless. It should look at systems, not at a person to blame, because blaming people teaches everyone to hide problems.

Logs, metrics, traces. The three ways a running system tells you what is happening. Logs are lines of text with a time on each. Metrics are numbers over time, such as requests per second, errors and response times. A trace follows one request through every service it touched. Together, they are called observability.

SLA, SLO, SLI. Three reliability terms, from the outside in. The Service Level Agreement is what you promised customers in a contract. The Objective is what you aim for internally. The Indicator is what you actually measure. This approach gave us the error budget, which is a good idea. 99.9% uptime allows about 43 minutes of downtime a month, and a team can choose to "spend" that time on risky launches.

Prod is down. This one isn't really jargon. It means the live system isn't working, and it gets everyone into a meeting very quickly.

Performance and systems words

Latency and throughput. Latency is how long one request takes. Throughput is how many requests you can handle per second. They aren't the same, and they often pull against each other: grouping requests into batches improves throughput but makes each request slower.

Race condition. A result that depends on the timing of things running at the same time. Two requests both read a balance of 100, both add 50, and both write 150. Fifty dollars disappear. Race conditions are among the hardest bugs, because they don't happen every time. They pass every test and then appear under real load.

REQUEST Aadd 50BALANCE100REQUEST Badd 50reads 100reads 100writes 150writes 150150should be 200:fifty dollars are lost
The example from the definition, in the order that loses the money.

Deadlock. Two processes each hold something the other needs, so both wait forever. A holds lock 1 and wants lock 2, while thread B holds lock 2 and wants lock 1. The program hasn't crashed. It's stuck waiting.

THREAD ATHREAD Block 1lock 2holdswantsholdswantseach waits for a lockthe other one holds
Solid lines are locks held, dashed arrows are locks waited for. The arrows make a loop, so neither thread can go on.

Bottleneck. The one part that limits the speed of the whole system, so making anything else faster is wasted effort. That's why the rule is to measure, or profile, before optimizing. When people measure, the bottleneck is often not where they guessed. It's also where the saying "premature optimization is the root of all evil" comes from.

Big O. How an algorithm's cost grows as its input grows, ignoring fixed costs. O(1) stays flat. O(log n) barely grows. O(n) grows in a straight line. O(n²) grows with the square of the input, which is fine at a hundred items and far too slow at a million. It's the shared shorthand for asking "will this still work when it gets big?"

input size ncostO(1)flatO(log n)barely growsO(n)linearO(n²)fine at a hundred items,too slow at a million
The four growth rates from the definition on one pair of axes. The shapes are what matters, not the units.

Cache and cache invalidation. A cache keeps a copy of expensive data somewhere fast. Cache invalidation is the famously hard problem of knowing when that copy is out of date. As the joke goes, there are only two hard things in computer science: invalidation, naming things, and off-by-one errors.

Horizontal and vertical scaling. Add more machines, or buy a bigger machine. Horizontal scaling, more machines, is the usual choice in the cloud. But it needs your app to cope with many copies of itself running at once, which is exactly where race conditions come back.

VERTICALbuy a bigger machineAPPAPPon a bigger machineHORIZONTALadd more machinesAPPCOPY 1COPY 2COPY 3the app has to cope with several copies running at once
Vertical scaling makes the machine bigger. Horizontal scaling adds machines.

Backpressure. A system further down the line telling you to slow down, instead of quietly being overloaded. Queues without backpressure don't fail straight away. They fail later, and the failure is much bigger.

Graceful degradation. When a service you depend on fails, do something smaller but still useful, instead of nothing. Show saved prices, hide the recommendations panel, but keep checkout working. It's the opposite of one failed service taking down the whole page.

Culture words and slang

Greenfield and brownfield. Greenfield is building on empty land: a new project, no limits, and all your own future mistakes ahead of you. Brownfield is renovating while people still live in the building: an existing system, real limits, and other people's past mistakes.

Dogfooding. Using your own product inside the company, so you hit its rough edges before your customers do. It comes from the phrase "eating your own dog food".

It's not a bug, it's a feature. The half-joking defence that surprising behaviour was intended. Sometimes it really was. WAI, short for "working as intended", is what people write when they close a ticket for that reason.

Heisenbug. A bug that disappears when you try to look at it. You attach a debugger, the timing changes, and the hides. It's named after Heisenberg's uncertainty principle in physics.

A round black and white portrait of Werner Heisenberg, with his name below.
Werner Heisenberg, the physicist the heisenbug is named after. His uncertainty principle, from 1927, says that the position and the speed of a particle can't both be known exactly.Photo: unknown photographer, public domain, via Wikimedia Commons (original). Changes: cropped to a circle and placed on a card with the name.

Rubber stamp and drive by. A rubber stamp is an approval with no real review behind it. A drive-by is a comment from someone who isn't involved in the work. Both are mildly negative.

Ship it. The decision word. Every engineering discussion ends, sooner or later, with someone deciding whether to say it.

Grokking. Understanding something so deeply that it becomes instinct rather than memory. The word comes from Robert Heinlein's novel Stranger in a Strange Land, and it's the real goal behind every entry above. Being able to define "" in a meeting isn't the goal. Noticing, while reading a change, that a retry isn't safe is.

A round black and white portrait of Robert A. Heinlein, from an old newspaper, with his name below.
Robert A. Heinlein in 1938, from a newspaper of that year, when he ran for the California State Assembly. His 1961 novel Stranger in a Strange Land gave English the word grok.Photo: unknown photographer, from a 1938 newspaper, public domain, via Wikimedia Commons (original). Changes: cropped to a circle and placed on a card with the name.

How to actually absorb all this

This post covers the words teams use to talk about code. There is a second set of words inside the code itself, such as delta, epsilon, i, tmp, ctx, foo, nil and 0xDEADBEEF. Those have their own post, Delta, Foo, and i.

Don't try to memorize this list. I think jargon only sticks when it names a problem you have had yourself. "Race condition" is just a term until the night one damages your data. After that, you won't forget it.

So use the list the other way round. When something at work feels confusing, wasteful or strangely hard, come back here and find out that it has a name. It almost always does. The vocabulary of software is mostly a list of things that went wrong before, each with a short name.

Check yourself

3 questions · nothing is saved
  1. 1.A payment request times out and is sent again. Why does it matter whether the request is idempotent?
  2. 2.Which of these is refactoring?
  3. 3.Two requests both read a balance of 100, both add 50, and both write 150. What is this bug called?

Who wrote this

Author profile and background

Takumi Yamada

Takumi Yamada

· Backend Engineer

Backend engineer building services, databases, Linux tooling, and NEGEN SYSTEMS. Writing about low-level mechanics, distributed systems, and real-world security.

End of post
NEGEN SYSTEMS
Receipt · post 14 of 31
Written
Feb 21, 2026
Length
3,963 words · 18 min
Built
…
Served by
…
Delivered
…
Over the wire
…
Go's share
…
Next in Software Engineering 101 · part 2 of 5

Delta, Foo, and i: The Tiny Names Hiding Inside Your Code

delta, epsilon, i and j, tmp, buf, ctx, foo and bar, nil, 0xDEADBEEF: the short words that appear in variable names rather than in meetings, and what each one actually stands for.

16 min read
From other series